Arak Refinery Expansion & Upgrading Project

Title:

 

Arak Refinery Expansion & Upgrading Project

 

Goals:
  • Increase throughput of the Refinery from 150,000 BPSD to 250,000 BPSD.
  • Cahange of Refinery feed from Ahwaz crude to a blend of Ahwaz and certain Iranian mixed crude oil.
  • Maximize Gasoline Production
  • Minimize Fuel Oil Production
  • Meet the Environmental Protection Obligations
 
 investment:

2.4  B €

 

Contractors:

 

EPC joint venture  (SEI of China , ODCC and Sazeh  from Iran)

 

Consultans:

 

  • Basic Design : JGC ( Japan)
  • PMC : Joint Venture of Enershimi & Mapsa ( Iran)

 

Licensors:

 

 Axens, UOP, Technip, KTI, RIPI

 
 Latest Status :

 Detailed Design Completed  , Procurement & Construction in Progress

  
    
No. New Units Cap. BPSD Licensor
1 ATM. Crude Distillation Unit (CDU) 80000  
2 No.2 Naphta Hydrotreater Unit (NHT2) 33,000 Axens
3 Octanizer Unit (OCT) 20,000 Axens
4 Gas Oil Hydrotreate Unit (GHT) 53,000 Axens
5 Kerosene Hydrotreater Unit (KHT) 31,500 Axens
6 Isomerization Unit (ISOM) 8,500 RIPI
7 Reduced Crude Desulfurization Unit (RCD) 94,387 UOP
8 Residue Fluid Catalyst Cracking Unit (RFCC) 69,180 UOP
9 Cracked Gasoline Hydrotreating Unit (CGH) 50,500 Axens
10 RFCC LPG Merox Unit (LMRX) 28,105 UOP
11 Propylene Recovery Unit (PRU) 28,105 UOP
12 Hydrogen Production Unit (HPU2) 67.5 *2 (135) MMSCFD  
13 No.2 SRU (SRU2 / TGT / Solidification) 320 *2 (640) TPSD  
14 Amine Treating Unit (AMN) 560 TPSD H2S  
15 Sour Water Stripping (SWS) 5000 TPSD SW  

 

No. PRODUCT Existing Cap. BPSD New Cap BSPD
1 Gasoline REG 23,512 77,439
2 Gasoline PREM  5,875  22,339
3 LPG 6,090 22,434
4 Kerosene 26,300 37,400
5 Gas Oil 47,010 56,123
6 Asphalt 6,000 6,000
7 Propylene 0 7,734
8 Fuel Oil 37,720 15,153
9 Sulfur 60 TPD 650 TPD